News

Assiniboine River Bridge

Assiniboine River Bridge

Construction Drilling recently finished construction of a 234 lineal meter sheet pile wall for PCL Constructor Canada on the Bridge Over Canadian Pacific Railway and Assiniboine River project in Brandon Manitoba


Duke Point Terminal

Duke Point Terminal

Construction Drilling is currently working on the Duke Point Terminal project for Ruskin Construction. Our scope of work includes falsework, land support and drilled shafts.


Talk to us now!

+1 250-746-4408 info@condrill.ca

Follow Us: